WATCH THIS Before You Install Your Baker DD7 or Grudgebox Transmission – Kevin Baxter Baxters Garage


If you are installing a Baker DD7 or Grudge Box Transmission, be sure to watch this video before you do. I show step by step on how to install it plus a few tips and tricks as well as a possible problem you may run into.

To find out more information about UShip you can click here…

If you would like to order any of the tools you see in this video or your Baker Transmission as a way of saying thanks for the information, call us at 678-226-9651 or email sales@baxtersgarage.com

JIMS M8 and TWIN CAM TRANSMISSION REBUILD KIT:

JIMS TOOLS USED in the video:
Inner Primary Bearing Race Tool

Main Drive Gear Puller and Installer

Transmission Pulley Locking Tool

Transmission Sprocket Locknut Wrench

Shift Shaft Seal Installer

Main Case Seal Installer

Countershaft Bearing Remover and Installer

6 Speed Vise Stand

Visit our website at www.baxtersgarage.com. If you’d like to support the channel thru membership and take advantage of special features, click here to find out how.

Pro Twin Performance and Baxter’s Garage
Nashville, TN
(678) 226-9651
sales@baxtersgarage.com

source

3 Comments

  1. What wonderful gifts you received! I'm still using many of the old tools my father gave me almost 50 years ago including micrometers dial indicators and such.

  2. Just to add that in WW2 when the US and UK got together making parts for the same aircraft us UK people had our parts rejected because we had a system where we would pair assembled parts (just like HD do today) whereas the US manufacturers would make parts to a finer tolerance so that if you needed a part you could just fetch one from the parts store and it would fit without the need to pairing.

Leave a Reply

Your email address will not be published. Required fields are marked *

© 2024 Grudge Races - GrudgeRaces.Com - WordPress Theme by WPEnjoy